Frfq Oldest dog in history 18000-year-old puppy found in Siberia
KARACHI:An anti-terrorism court (ATC) once again issued notices to the Home secretary on Saturday regardin
adidas 80s g the provision of weapons, bullets and licences to terrorists. The court also directed the Anti-Violent Crime Cell (AVCC) SSP to appear before the court with a report.The accused appeared before the court. T
air jordan4 he investigation officer (IO), DSPs of Saddar, Preedy and Forensic Science Laboratory (FSL) also a
adidas originals nizza ppeared before the court.The FSL DSP presented a report which maintained that neither had the dealer ever sent them empty bullet shells for record nor had they received any orders in this regard from the higher authorities.Govt lifts ban on automatic weapons licensesThe court expressing discontentment issued a notice to Home secretary once again and directed him to present a report on action taken against those violating Section 4-A of the Sindh Arms Act.Section 4-A of the Sindh Arms Act deals with the ballistic signature, whereby the arms dealer must provide biometric verification Ihgv ABAD against illegal construction
KARACHI:Pakistan Railways Divisional Superintendent (DS) in Karachi Arshad Salam Khattak, along with divisional officers, carried out the annual inspection of the railway stations and other structures from Karachi to Kotri on Sunday.As part of the inspection, the officials checked the condition of railway tracks, level crossings, bridges and stations, and assessed the available record and preparedness of railway staff for coping with any untoward incidents.The 14-hour-long inspection commenced from the Cantt Station, Karachi and ended at Kotri. During the course,
adidas spezial pink the officials visited and examined records at Drigh Road, Malir, Landhi, Jumma Goth
adidas gazelle bold donna , Bin Qasim, Dhabeji, Jungshahi, Ran Pathani, Meting, Braudabad, Bholari and Kotri stations. Als
air air max o, they assessed the strength of bridges between Karachi and Kotri.Further, the crisis handling and preparedness for accidents of gatemen at level crossings along the track was examined by the DS.The DS also talked to railway staff at the stations and