Auteur Sujet: jwqt Maguire fails to measure up as Van Dijk leads Liverpool title charge  (Lu 47 fois)

MethrenRaf

  • Hero Member
  • *****
  • Messages: 114550
    • mkzk Woman attacked by two others after asking them to wear masks in New York subway station elevator
Ogyv Amazon.com to cut several hundred jobs
  ISLAMABAD:Capital Devel adidas spezial marron opment Authority (CDA) Enforcement Directorate has so far demolished almost 120 structures along the IJP Road in its anti-encroachment drive. The encroachments were removed during three days of the operation that started on Wednesday along the road from Fiazabad, Double Road, Pindora Chungi, New Katarian, Khayaban-e-Sir Syed, Mandi Morr and Dhok Naju. According to a statement issued on Friday, some 32 kiosks, 50 sheds, six building material selling points, nine cattkle sheds, 10 permanent  adidas originals hamburg stalls, three rooms, two boundary walls, two tyre shops, eight sb dunks  fences, several counters, sign boards, billboards and other encroachment were demolished. In addition to the operation conducted along the IJP Road, the CDA Enforcement Directorate also conducted operations in other areas of the city. Btna Chinese dissident s widow sends desperate letter
 RAWALPINDI:In a significant move towards sustainable energy and m jordan aura odernisation, the provincial education department has embarked on a project to convert the electricity systems of 86 government schools to solar energy.This initiative, which includes 10 schools in the Rawalpindi division, is backed by a substantial allocation of Rs500 million.Under the plan, the first phase aims to transition these government schools to sol air max sale ar power by May 31. The subsequent phase is slated to commence on August 15, post the summer vaca adidas samba original tion period.The Secretary of Education has taken proactive steps by dispatching letters to all school heads, Divisional Education Directors, and District Education Authorities, urging swift action in selecting suitable school sites for solar panel installation.Furthermore, they have been tasked with facilitating access to representatives of contracted solarisation companies and appointing focal persons to ensure timely project completion. The ministry has also requested the