Auteur Sujet: rczw Lahore grapples with unscheduled load shedding  (Lu 221 fois)

MethrenRaf

  • Hero Member
  • *****
  • Messages: 161869
    • drwg The Quest TV Competition Turns Fantasy Into Reality Television
rczw Lahore grapples with unscheduled load shedding
« le: Juin 25, 2024, 03:02:50 pm »
Dtld SHC extends order against KMC tax collection via K-E bills
  PIND DADAN KHAN:The construction of the 128-km Lillah-Jhelum dual carriageway, which began in 2021, continues to face delays due to a lack of funds over the past two financial years, greatly affecting  air max 96 local commute and transport for the more than one million af1  residents of Pind Dadan Khan in Jhelum di jordan rosa strict. Hxfu Afghan forces Taliban continue to clash even as peace talks start
 ISLAMABAD:While most areas of the federal capital remain under lockdown after 25 confirmed cases of the novel coronavirus (Covid-19) were reported in the city, some personnel who have been deemed as essential personnel, have to fac new balances 530 e a different challenge every day.Apart from the fact that they have to travel to the federal capital from their residences in adjoining areas daily while maintaining minimum social distance and manage personal protective equipment, many say they also have to face a gridlock at Faizabad at p adidas 00s eak hours.The Islamabad Traffic Police (ITP) has restricted travel on five of the six lanes of the Islamabad Expressway. At Faizabad, a checkpoint has been set up where they screen travellers to ensure that only authorised and essential personnel as deemed b adidas marathon tr original y the Islamabad Capital Territory (ICT) Administration are travelling to the federal capital.Non-essential or unnecessary travellers are sent back and one lane of the Expressway is utilised for the purpose.However, this