Mnuq Euro edges up as lira recovers
  KARACHI:Sindh government on Tuesday signed an agreement with Patient's Aid Foundation (PAF) at CM House to launch an ambulance service under the name of  Sindh Emergency Medical Response Service  in Karachi. The project will operate under the public-private partnership (PPP) model.Initially, a fleet of 60 fully-equipped vehicl 
stan smith bleu es will start operating in the city and later, the number will be increased to 200. The agreement was signed by Mushtaq Chhapra of Patients' Aid Foundation (PAF) and Sindh Health Secretary Usman Chachar. Sindh Chief Minister Syed Murad Ali Shah, Health Minister Dr  
jordan 1 jordan Azra Fazal Pechuho, CM Advisor Murtaza Wahab,聽 Finance Secretary Syed Najam Shah, Special Health Secretary Dr Dabir, Zahid Bashir of PAF, Jinnah  
adidas spezial Postgraduate Medical Centre (JPMC) Executive Director Dr Seemi Jamali, Tariq Mahmood of JPMC, Murtaza Abbas Kazmi of Aman Health Care Service and Principal Secretary to CM Sajid Jamal Abro were present on the occasion. The Sindh government, during the current fi Llvq Three Kashmiri journalists win Pulitzer for coverage of India s lockdown
 ISLAMABAD:The unavailability of electricity is having a devastating impact on the engineering industry  rsquo s ability to meet production targets, with a staggering 83 per cent of companies that took part in a survey raising the issue.The Pakistan Institute of Development Economics (PIDE) on Sunday released a report on the challenges faced by engineering firms and provide 
air force 2 s insights into the state of the industry. The research team was led by Dr Nadeemul Haque and  
af1 bianche included Dr Usman Qadir, Dr Abid Rehman, and Mohammad Armughan, according to PIDE press release.The report is based on a survey of 328 engineering firms from a 
campus 00s adidas cross Lahore, Gujrat, and Gujranwala   ndash  with the area often referred to as the   lsquo golden triangle  rsquo  of engineering firms. The report reveals statistics that underscore the critical concerns affecting the industry   39 s growth and productivity.One of the foremost issues outlined in the report is the severe impact of electricity unavailability on daily produc