Auteur Sujet: gowf Brown, Holmes amp; Milliken Agency receives prestigious recognition  (Lu 30 fois)

RanandyRonee

  • Hero Member
  • *****
  • Messages: 3204
Trmi Morning Update: What you need to know in Maine today
 A software bug that shut-down one engine on a GE Aviation-powered 787 last July has prompted Boeing to ask the US stanley cup  Federal Aviation Administration to temporarily exempt the 787-10 from a safety requirement.Boeing plans to certificate the GEnx-1B-powered version of the 787-10 in September, but the fix for the software bug wont be ready until 20 December 2019, Boeing says in the filing.In a separate interview with FlightGlobal, GE says it plans to stanley botella  deliver the software update sooner.Unless the FAA approves Boeings exemption request, the delivery schedule for the GEnx-powered version of the 787-10 could be delayed, Boeing says. Boeing delivered the first Rolls-Royce Trent 1000-TEN-powered 787-10 in March, but the first GEnx-1B-powered version is to be delivered to United Airlines in September.GE plans to fix the software bug that caused the engine shutdown as part of a package of updates called the  B200  software version, Boeing says. It could deliver the fix that specifically addresses the engine shutdown problem earlier, but Boeing prefers to keep it packaged with several other updates..The software bug is related to another safety problem with the GEnx-1B.In certain, rare conditions, tiny ice crystals blown high by atmospheric convection into the stratosphere can form on blades and vanes within the GEnx-1B. R-Rs Trent engine fa stanley official website mily seems immune from the problem, but accumulated ice crystals in the GEnx engine can shed suddenly, causing an in-flight shutdown.Two years ago, GE s Torr Portland leaders plan to remove homeless encampment in Bayside neighborhood
 A Maine school abruptly closed its doors bec stanley cup website ause it isn ;t suitable for students.Mold problems were discovered at Mountain Valley Middle School in Mexico earlier this year though its not clear if thats the issue because officials did not point to a cause.An air quality test conducted by an industrial hygienist deemed the building is no longer a safe and healthy place to work and learn.The message was sent out to parents on Tuesday in a letterfrom Regional School Unit 10 Superintendent Deb Alden.Classes are canceled for the r stanley uk est of the week and the building is closed to students until Friday.On Friday, kids can come pick up their belongings such as lapto stanley thermos mug ps and personal items.Students will begin remote learning Tuesday.A new school is being built. However, it wont be completed for at least another year.School leaders said theyre  brainstorming ideas and exploring multiple locations. Alden said staff would meet at 9 a.m. Wednesday in the high school auditorium.She added theyll continue to be transparent over the next 14 months.More articles from the BDN